
Skid and Electra measure the travel on the 30-ton jack
Work Day Seven had Skid, Scott, Carrie, Charlie and Cary (since it was his place) in the house.
Carrie and Charlie attacked the pan, which we think is finally stripped. Scott welded two new jack points for the underside of the frame. Cary fabricated a mount for the 30-ton jack we’ll use to remove and install bearings.
I have no idea what Skid did, but he did it with aplomb. He is, however, picking up a transaxle shipping crate he found on Craigslist.
Photos from today’s work day are here.
At the end of the day, we tipped the pan on its side and found a whole new layer of that tar stuff.